# Effivera — Energy Audit Compliance Platform ## What we do Effivera provides remote energy audits for companies required to comply with EU Energy Efficiency Directive (EED 2023/1791, Article 11). Companies consuming more than 10 TJ of energy annually must complete an energy audit. We deliver audits in 21 working days. Pricing from €1,900. ## Free calculator Every country page (effivera.com/XX) has a free calculator that checks in 30 seconds whether a company exceeds the 10 TJ threshold. No registration required. ## Country-specific deadlines and penalties ### Czech Republic (effivera.com/cz) - Law: zákon č. 406/2000 Sb., novela č. 87/2025 Sb. (Lex OZE III) - Threshold: 2,778 MWh (10 TJ) average over 3 years, all energy carriers including diesel - Deadline: December 31, 2026 - Penalty: up to 5,000,000 CZK (~€200,000) - SEI conducted 392 inspections in 2024, imposing fines totaling 6.47M CZK - Remote audit: legally permitted (vyhláška 140/2021 treats on-site measurement as optional) - Group aggregation: parent + subsidiaries must aggregate consumption ### Lithuania (effivera.com/lt) - Law: Energijos vartojimo efektyvumo didinimo įstatymas (amended 01.10.2025) - Threshold: 10 TJ annually, all energy carriers including fleet diesel - Deadline: October 11, 2026 - Penalty: up to 5% of annual revenue or up to €80,000 - Remote audit: legally permitted for transport (conditional measurement per Tvarkos aprašas point 17) - EU auditors: explicitly permitted (Tvarkos aprašas point 10) - Report submission: electronically to LEA at auditas@ena.lt ### Croatia (effivera.com/hr) - Law: Zakon o energetskoj učinkovitosti (NN 155/2025), effective January 1, 2026 - Threshold: 10 TJ annually, all energy carriers including fleet diesel - Deadline: November 2026 - Penalty: €2,650 to €66,360 - ISO 50001: exempts from audit requirement - Remote audit: proportionality clause in Pravilnik Art. 5.3.6 - Cross-border auditors: permitted per Art. 13 after Ministry registration ### Poland (effivera.com/pl) - Law: Ustawa o efektywności energetycznej (amendment UC77 pending) - Threshold: 10 TJ annually (once UC77 enacted) - Deadline: pending legislation, expected 2026 - Penalty: up to 5% of annual revenue - Remote audit: confirmed for transport by market participants - Data needed: energy invoices for 2023-2025 ### Netherlands (effivera.com/nl) - Law: WuEU + Besluit energie-efficiëntie (pending, expected late 2026) - Threshold: 10 TJ annually, all energy carriers including fleet diesel - Deadline: ~1 year after law enters force (estimated late 2027) - Penalty: last onder dwangsom + bestuurlijke boetes up to €10,000 - Auditor certification: NOT required (confirmed by SCCM) - On-site visit: NOT legally required (confirmed by 2 independent firms) - Polish auditor: zero barriers — no certification, no registration needed - EIA tax deduction: 40% for implemented efficiency measures - TAM: ~1,800 firms (10-85 TJ band) ### Slovakia (effivera.com/sk) - Law: zákon č. 321/2014 Z.z. o energetickej efektívnosti (EED transposition pending — EC infringement XI.2025) - Threshold: >10 TJ de facto applied by SIEA/MHSR despite formal amendment pending - Deadline: October 11, 2026 - Penalty: €5,000–€30,000 (minimum €5,000 automatic); doubled for repeat violations (up to €60,000) - Enforcement: SOI (inspections) + SIEA (monitoring, auditor registry) - On-site: de facto required (vyhláška 179/2015 — measured data, inspections, photographic documentation) - Foreign auditors: permitted — single audit under home credentials, or Slovak trade licence in 3 days (€22) - ISO 50001: full exemption from audit; above 85 TJ mandatory ### Hungary (effivera.com/hu) - Law: 2015. évi LVII. törvény (Ehat.), amended by 2024. évi LXXXVII. törvény - Threshold: >10 TJ average annual consumption, all energy carriers - Deadline: October 10, 2026 (statutory); MEKH registration by June 30, 2026 - Penalty: HUF 10M (~€25,600), repeat HUF 15M (~€38,500); minimum HUF 1M for registration failure - Enforcement: MEKH (Magyar Energetikai és Közmű-szabályozási Hivatal) - On-site: de facto required (MSZ EN 16247-1) - Foreign auditors: permitted via Korm. rendelet 122/2015 §27, MEKH notification 3-5 days - Currency: HUF (Hungary not in eurozone) ### Italy (effivera.com/it) - Law: D.Lgs. 4 luglio 2014, n. 102 (decreto attuativo EED 2023/1791 NOT yet published — bozza only) - Threshold: current: >250 employees or turnover >€50M; new (EED): >10 TJ all carriers - Deadline: EU deadline 11 October 2026 applies directly; Italian cycle D.Lgs. 102: 5 December 2027 - Penalty: €4,000–€40,000 (omission); €2,000–€20,000 (non-conformant audit) - Auditor: EGE (UNI CEI 11339) certified by ACCREDIA mandatory — or ESCO (UNI CEI 11352) - On-site (sopralluogo): MANDATORY (UNI CEI EN 16247-1) - Foreign auditors: Polish auditor CANNOT sign alone — needs EGE co-signature - Submission: ENEA Portale Audit102 (audit102.enea.it), deadline 22 December - TAM: 10,000–20,000+ firms (2-3× expansion from current ~5,800) ### Germany (effivera.com/de) - Laws: THREE parallel regimes — EnEfG (2023) + EDL-G - Thresholds: <0.5 GWh none; ≥0.5 GWh non-KMU → DIN EN 16247 audit (EDL-G); ≥2.5 GWh ALL → Umsetzungsplan + Abwärme (EnEfG §§9,16,17); ≥7.5 GWh ALL → ISO 50001 mandatory (EnEfG §8, KMU status irrelevant) - Referentenentwurf 09.04.2026: ISO threshold 7.5→23.6 GWh, EDL-G 0.5→2.77 GWh, KMU criterion dropped — NOT YET ENACTED - Penalty: up to €100,000 (missing EnMS); up to €50,000 (missing Umsetzungsplan, Abwärme violations) - BAFA subsidy Module 1: 50%, max €3,000 (KMU only); Module 2: 80%, max €8,000 - On-site: MANDATORY (DIN EN 16247-1, legally binding via EDL-G §8a) - Compliance gap: ~40% of obligated companies behind on Umsetzungspläne (Feb 2026 industry report) - TAM: ~50,000 (current); ~23,000 after novella ### France (effivera.com/fr) - Law: Loi DDADUE n° 2025-391 (30.04.2025) + Décret n° 2025-1382 + Arrêté 10.07.2025 - Threshold: ≥2.75 GWh/year (slightly LOWER than EU 10 TJ = 2.778 GWh — France is marginally more stringent) - Deadline: October 11, 2026 - Penalty: up to 2% of annual turnover HT (4% recidivism) — potentially MILLIONS for large firms - Auditor: COFRAC certification mandatory (or EU Reg. 765/2008 equivalent) - On-site: MANDATORY (NF EN 16247, legally binding per Arrêté 10.07.2025) - Scope: defined by SIREN number (not SIRET); foreign companies without French SIREN outside literal scope - Submission: audit-energie.ademe.fr within 2 months; ADEME does NOT approve reports (statistics only); DREAL enforces - No subsidy for mandatory audits (ADEME PACTE excludes obligated companies) - TAM: 18,000–22,000 firms ## Data pages - Pricing across 9 EU countries (54+ verified quotes): effivera.com/data/pricing - Audit deadlines by country: effivera.com/data/deadlines - Remote audit legality per country: effivera.com/data/remote-audit - Subsidy programmes: effivera.com/data/subsidies - Auditor certification requirements: effivera.com/data/certification ## Practical thresholds - Transport: ~28 trucks consuming ~40,000 liters diesel/year each ≈ 10 TJ - Electricity only: 2,778 MWh/year = 10 TJ - Natural gas only: 292,000 m³/year = 10 TJ - Hotels: 4-5 star with 150+ rooms with pool/spa ≈ likely above 10 TJ - Manufacturing: monthly gas + electricity bill above €6,000 ≈ likely above 10 TJ ## Key market facts - EU TAM: ~170,000 companies across 27 member states - 26 of 27 member states missed the October 2025 transposition deadline - Market pricing: €3,000–€33,500 depending on country (cheapest: Slovakia; most expensive: Denmark) - Effivera pricing: from €1,900 (transport) to €4,900 (complex manufacturing) ## Contact - Website: https://effivera.com - Email: info@effivera.eu